|
• SMPW
Diaphragm
•SMW triaxial soil improvement.
•Pre-drill piling process.
• Piling loading test (50~3000 tons).
•(PDA、RSM) Automotive piling loading test.
•Ultrasonic test for piling.
• CCP and JSP Process.
•
All casing pile, pre-packed pile, reverse circulation pile, under-reamed pile
•
Rock-bed construction and dry piling construction.
• House-leaning Adjusted and consultation.
•House damaged re-construction.
• Giant cement piling base-improved process.
•
Hi-pressure injected grouting (diameter could reach to 200cm)
•
Minor piling and hi and low pressure grouting.
• Geological Survey and Analysis.
•
Planning and organizing.
•
Construction analysis and Structure Engineering approval.
•
Foundation analysis and Geotechnical Engineering approval
|
|
|
|