Ideality
Ideality
Organization
Organization
Equipment
Equipment
Statement
Statement
All Casing Pile
All Casing Pile
Embedded PC Pile Process
Embedded PC Pile Process
Reverse circulation drill pile
Reverse circulation drill pile
Pre-packed pile Process
Pre-packed pile Process
Test on pile
Test on pile
House-leaning Adjusted
House-leaning Adjusted
Cement Stirred Pile
Cement Stirred Pile
Characteristic of CCP - JSP
Characteristic of CCP - JSP
SMPW • SMW Process
SMPW • SMW Process
Ground Anchors
Ground Anchors
Investigation and analysis
Investigation and analysis
Construction Design
Construction Design
Founded Piling Process Record.
Founded Piling Process Record.
地質調查業績
地質調查業績
結構設計業績
結構設計業績
機具名稱
製造地
廠牌
型式